Today's Inspections

 
PERMITADDRESSINSPECTIONINSPECTORTIMERESULTCOMPLETED
Data pager
1
Page size:
PageSizeComboBox
select
 48 items in 1 pages
719 CHESTER AVEPlumbing RoughDAVID OWENSTBD   
27 ENCLAVE CT**Plumbing FinalDAVID OWENSTBD   
27 ENCLAVE CT**Gas FinalDAVID OWENSTBD   
29 ENCLAVE CT**Plumbing FinalDAVID OWENSTBD   
29 ENCLAVE CT**Gas FinalDAVID OWENSTBD   
31 ENCLAVE CT**Plumbing FinalDAVID OWENSTBD   
31 ENCLAVE CT**Gas FinalDAVID OWENSTBD   
33 ENCLAVE CT**Plumbing FinalDAVID OWENSTBD   
33 ENCLAVE CT**Gas FinalDAVID OWENSTBD   
35 ENCLAVE CT LOT 36**Plumbing FinalDAVID OWENSTBD   
35 ENCLAVE CT LOT 36**Gas FinalDAVID OWENSTBD   
1102 VAN BUREN DRFramingTONY SPRISSLERTBDFail01/19/2018 
115 GRANADA AVEMech Rough-InJOE KRASNODEMSKITBDPass01/19/2018 
916 LANGDON CTFramingHENRY GUTIERREZTBD   
29 W WASHINGTON ST CMMN AREASBldg Rough-InHENRY GUTIERREZTBD   
33 ENCLAVE CT**Electrical FinalCLINTON C. PRATTTBDPass01/19/2018 
35 ENCLAVE CT**Electrical FinalCLINTON C. PRATTTBDPass01/19/2018 
502 JOSEPH JOHNSON PLFramingHENRY GUTIERREZTBD   
310 HALSEY RDBldg FootingHENRY GUTIERREZTBD   
33 ENCLAVE CT**ELECTRICAL FINALCLINTON C. PRATTTBDPass01/19/2018 
35 ENCLAVE CT**ELECTRICAL FINALCLINTON C. PRATTTBDPass01/19/2018 
916 LANGDON CT**MECHANICAL FINALJOE KRASNODEMSKIDAYPass01/19/2018DAY
1130 LAKE HERON DR 2A**MECHANICAL FINALJOE KRASNODEMSKIDAYPass01/19/2018DAY
1130 LAKE HERON DR 2A**ELECTRICAL FINALJOE KRASNODEMSKIDAYPass01/19/2018DAY
13 SILVERWOOD CIR 5**MECHANICAL FINALJOE KRASNODEMSKIDAYFail01/19/2018DAY
37 MADISON PL 3MECH ROUGH-INJOE KRASNODEMSKIDAYPass01/19/2018DAY
2 ALDEN LNELEC WALL CLOSE-INCLINTON C. PRATTDAY  DAY
716 GENESSEE ST LOT ASEC PROGRESSCHARLES BROWNTBD 01/19/2018 
SPA CREEKSEC PROGRESSCHARLES BROWNTBDPass01/19/2018 
DORSEY AVESEC PROGRESSCHARLES BROWNTBD   
1 NORWOOD RDSEC PROGRESSCHARLES BROWNTBD   
161 PORTER DR LOT BSEC PROGRESSCHARLES BROWNTBDPartial01/19/2018 
196 S CHERRY GROVE AVE**Mechanical FinalJOE KRASNODEMSKITBDFail01/19/2018PM
404 HALSEY RDMech Rough-InJOE KRASNODEMSKITBDPass01/19/2018 
2 COMPROMISE STFramingTONY SPRISSLERTBDPartial01/19/2018 
19 COLLEGE AVE**Mechanical FinalJOE KRASNODEMSKITBDFail01/19/2018 
95 CONDUIT STFramingHENRY GUTIERREZTBD   
95 CONDUIT STInsulationHENRY GUTIERREZTBD   
212 KING GEORGE ST A**Mechanical FinalJOE KRASNODEMSKITBDPass01/19/2018 
7074 BEMBE BEACH RDFramingTONY SPRISSLERTBDPass01/19/2018AM
8 MARKET SPACEELECTRICAL PROGESSCLINTON C. PRATTTBDFail01/19/2018 
801 CHASE STSLABSTEVEN ANDREWSTBD  AM
703 GIDDINGS AVE L3**Mechanical FinalJOE KRASNODEMSKITBDPass01/19/2018 
314 SIXTH STBLDG FOOTINGSTEVEN ANDREWSTBD   
510 SEVERN AVEBldg FootingSTEVEN ANDREWSTBD   
801 CHASE STElec Rough-InCLINTON C. PRATTTBDPass01/19/2018 
940 CREEK DRBldg FootingSTEVEN ANDREWSTBD  PM
940 CREEK DR**BUILDING FINALSTEVEN ANDREWSTBD